Content Creation
#design
mfg-production-planning
Design production plans using MPS (Master Production Schedule), MRP (Material Requirements Planning), and capacity planning. Use this skill when the user needs to schedule production, plan material procurement, balance capacity with demand, or optimize production sequencing — even if they say 'we can't keep up with orders', 'when should we order materials', 'production scheduling', or 'how do we plan for next quarter's demand'.
DeepseekModel
Curated skill
Quality Excellent · 78
v1.0.0
Get
https://deepseekmodel.com/api/download.php?id=asgard-ai-platform-skills-mfg-production-planning-skill-md&format=skill
Download .skill
Standard format with system_prompt and model_config, ready for any agent framework
The actual content of the system_prompt field in the .skill file.
name mfg-production-planning description Design production plans using MPS (Master Production Schedule), MRP (Material Requirements Planning), and capacity planning. Use this skill when the user needs to schedule production, plan material procurement, balance capacity with demand, or optimize production sequencing — even if they say 'we can't keep up with orders', 'when should we order materials', 'production scheduling', or 'how do we plan for next quarter's demand'. metadata {"category":"WP-03 製造業","tags":["manufacturing","production-planning","mrp","scheduling"]} Production Planning (MPS/MRP) Framework IRON LAW: Plan Hierarchically — Demand → MPS → MRP → Shop Floor Production planning flows TOP-DOWN: 1. Demand forecast / customer orders → what to make, when 2. MPS → master schedule for finished goods 3. MRP → material and component requirements (what to buy, when) 4. Shop floor scheduling → which machine, which sequence Skipping levels (going from demand forecast directly to shop floor) creates chaos — material shortages, capacity conflicts, missed deliveries. Planning Hierarchy Level Plan Horizon Granularity Decides Strategic S&OP (Sales & Operations Planning) 12-18 months Monthly, product family Capacity investments, workforce planning Tactical MPS (Master Production Schedule) 3-6 months Weekly, end product What to produce each week Operational MRP (Material Requirements Planning) 4-12 weeks Daily, component/material What to order, when, how much Execution Shop Floor Scheduling 1-2 weeks Hourly, work center Sequence, machine assignment MPS Process Inputs : Demand forecast + customer orders + current inventory + safety stock targets Logic : For each week, calculate: Production Needed = Demand - Beginning Inventory - Scheduled Receipts + Safety Stock Output : Planned production quantities by week for each finished product Constraint : Must not exceed available capacity (rough-cut capacity planning check) MRP Process Inputs : MPS (what to make) + BOM (Bill of Materials — what it's made of) + Inventory status + Lead times Logic : "Explode" the BOM — for each finished good, calculate when each component/material must be ordered to arrive in time Output : Planned purchase orders and production orders with dates and quantities Key calculation : Order date = Need date - Lead time Scheduling Algorithms Algorithm Rule Best When FCFS (First Come First Served) Process in order received Low complexity, fairness matters SPT (Shortest Processing Time) Shortest job first Minimize average flow time EDD (Earliest Due Date) Most urgent due date first Minimize late deliveries Bottleneck-first Schedule the constraint first, subordinate rest Capacity-constrained environments (TOC logic) SMED (Single-Minute Exchange of Die) Reduce changeover time to increase flexibility: Separate internal setup (machine stopped) from external (can do while running) Convert internal to external where possible Streamline remaining internal steps Practice and standardize Output Format # Production Plan: {Product/Period} ## Demand vs Capacity | Week | Demand | Available Capacity | Gap | |------|--------|-------------------|-----| | W1 | {units} | {units} | {+/-} | ## Master Production Schedule | Week | Product A | Product B | Product C | Total | |------|----------|----------|----------|-------| | W1 | {units} | {units} | {units} | {units} | ## Material Requirements | Material | Quantity | Order Date | Supplier | Lead Time | |----------|---------|-----------|----------|-----------| | {material} | {qty} | {date} | {supplier} | {days} | ## Scheduling | Work Center | Mon | Tue | Wed | Thu | Fri | |------------|-----|-----|-----|-----|-----| | {center} | {job} | {job} | ... | ... | ... | Gotchas Forecast accuracy limits everything : MPS/MRP is only as good as the demand forecast. Track forecast accuracy (MAPE) and build safety stock proportional to forecast error. Lead time variability kills plans : If supplier lead time is "2-6 weeks" (4 week variability), you need safety stock for the worst case. Reduce variability through supplier management. BOM accuracy is critical for MRP : A wrong BOM means ordering wrong materials. Audit BOMs quarterly. Frozen zone : The first 1-2 weeks of MPS should be "frozen" (no changes) to allow stable execution. Changes inside the frozen zone cascade chaos through the system. Finite vs infinite capacity : Basic MRP assumes infinite capacity (ignores machine constraints). Always layer a capacity check (rough-cut or detailed) on top of MRP output. References For S&OP process design, see references/sop-process.md For demand forecasting methods, see references/demand-forecasting.md
Keywords that activate this skill. Click one to copy it.
This skill does not provide trigger words.
The downloaded .skill package contains the following fields.
| Field | Description |
|---|---|
| format | Format tag (skill/v1) |
| skill_id | Unique skill ID |
| name | Skill name |
| version | Version |
| description | Description |
| category | Categories (array) |
| trigger_words | Trigger words |
| tags | Tags |
| source | Source |
| source_url | Source URL (this page) |
| exported_at | Exported at (set per download) |
| system_prompt | System prompt body |
| model_config | Model config: provider / model / temperature / max_tokens / top_p |
| examples | Examples |
| install_guide | Import guide for Coze / Dify / Claude / custom frameworks |
The same skill can be exported in different platform formats.