Skills Plugins MCP Prompt Model 博客 我的中心

retrospective

Generates a sprint or milestone retrospective by analyzing completed work, velocity, blockers, and patterns. Produces actionable insights for the next iteration.

DeepseekModel Curated skill Quality Excellent · 90 v1.0.0

Get

https://deepseekmodel.com/api/download.php?id=donchitos-claude-code-game-studios-claude-skills-retrospective-skill-md&format=skill
Download .skill Standard format with system_prompt and model_config, ready for any agent framework
The actual content of the system_prompt field in the .skill file.
name retrospective description Generates a sprint or milestone retrospective by analyzing completed work, velocity, blockers, and patterns. Produces actionable insights for the next iteration. argument-hint [sprint-N|milestone-name] user-invocable true allowed-tools Read, Glob, Grep, Write, Bash, AskUserQuestion model sonnet Phase 1: Parse Arguments Determine whether this is a sprint retrospective ( sprint-N ) or a milestone retrospective ( milestone-name ). Phase 1b: Check for Existing Retrospective Before loading any data, glob for an existing retrospective file: For sprint retrospectives: production/retrospectives/retro-[sprint-slug]-*.md (also check production/sprints/sprint-[N]-retrospective.md as an alternate location) For milestone retrospectives: production/retrospectives/retro-[milestone-name]-*.md If a matching file is found, use AskUserQuestion : Prompt: "An existing retrospective was found: [filename]. How do you want to proceed?" Options: [A] Update existing — load it and add/revise sections with new data [B] Start fresh — generate a new retrospective (archive the old one) If [A]: read the existing file and carry its content forward, revising sections with new data. If [B]: continue to Phase 2 with a blank slate. Before writing the new file, rename the existing one with a -archived-[date] suffix. Phase 2: Load Sprint or Milestone Data Read the sprint or milestone plan from the appropriate location: Sprint plans: production/sprints/ Milestone definitions: production/milestones/ Also check for production/sprint-status.yaml : if it exists, read it alongside the sprint plan. It is the authoritative source for actual story completion status (status: done, completed dates, blockers). Use it as the primary source for completion metrics in Phase 3. Fall back to markdown scanning only if the yaml does not exist. Note discrepancies between the yaml and the sprint plan (e.g., stories in yaml not in plan, or vice versa). If the file does not exist or is empty , output: "No sprint data found for [sprint/milestone]. Run /sprint-status to generate sprint data first, or provide the sprint details manually." Then use AskUserQuestion to present two options: [A] Provide data manually — ask the user to paste or describe the sprint tasks, dates, and outcomes; use that as the source of truth for the retrospective. [B] Stop — abort the skill. Verdict: BLOCKED — no sprint data available. If the user chooses [A], collect the data and continue to Phase 3 using what they provide. If the user chooses [B], stop here. Extract: planned tasks, estimated effort, owners, and goals. Run git log for the sprint period to understand what was actually committed and when. Use the Bash tool (which uses Git Bash on Windows — the 2>/dev/null is bash syntax, not PowerShell): Bash: git log --oneline --since="4 weeks ago" 2>/dev/null || git log --oneline -20 Adjust the --since date to match the sprint duration if known from the sprint plan. Phase 3: Analyze Completion and Trends Scan for completed and incomplete tasks by comparing the plan against actual deliverables. Check for: Tasks completed as planned Tasks completed but modified from the plan Tasks carried over (not completed) Tasks added mid-sprint (unplanned work) Tasks removed or descoped Scan the codebase for TODO/FIXME trends: Count current TODO/FIXME/HACK comments Compare to previous sprint counts if available (check previous retrospectives) Note whether technical debt is growing or shrinking Read previous retrospectives (if any) from production/retrospectives/ to check: Were previous action items addressed? Are the same problems recurring? How has velocity trended? Phase 4: Generate the Retrospective ## Retrospective: [Sprint N / Milestone Name] Period: [Start Date] -- [End Date] Generated: [Date] ### Metrics | Metric | Planned | Actual | Delta | |--------|---------|--------|-------| | Tasks | [X] | [Y] | [+/- Z] | | Completion Rate | -- | [Z%] | -- | | Story Points / Effort Days | [X] | [Y] | [+/- Z] | | Bugs Found | -- | [N] | -- | | Bugs Fixed | -- | [N] | -- | | Unplanned Tasks Added | -- | [N] | -- | | Commits | -- | [N] | -- | ### Velocity Trend | Sprint | Planned | Completed | Rate | |--------|---------|-----------|------| | [N-2] | [X] | [Y] | [Z%] | | [N-1] | [X] | [Y] | [Z%] | | [N] (current) | [X] | [Y] | [Z%] | **Trend** : [Increasing / Stable / Decreasing] [One sentence explaining the trend] ### What Went Well - [Observation backed by specific data or examples] - [Another positive observation] - [Recognize specific contributions or decisions that paid off] ### What Went Poorly - [Specific issue with measurable impact -- e.g., "Feature X took 5 days instead of estimated 2, blocking tasks Y and Z"] - [Another issue with impact] - [Do not assign blame -- focus on systemic causes] ### Blockers Encountered | Blocker | Duration | Resolution | Prevention | |---------|----------|------------|------------| | [What blocked progress] | [How long] | [How it was resolved] | [How to prevent recurrence] | ### Estimation Accuracy | Task | Estimated | Actual | Variance | Likely Cause | |------|-----------|--------|----------|--------------| | [Most overestimated task] | [X] | [Y] | [+Z] | [Why] | | [Most underestimated task] | [X] | [Y] | [-Z] | [Why] | **Overall estimation accuracy** : [X%] of tasks within +/- 20% of estimate [Analysis: Are we consistently over- or under-estimating? For which types of tasks? What adjustment should we apply?] ### Carryover Analysis | Task | Original Sprint | Times Carried | Reason | Action | |------|----------------|---------------|--------|--------| | [Task that was not completed] | [Sprint N-X] | [N] | [Why] | [Complete / Descope / Redesign] | ### Technical Debt Status - Current TODO count: [N] (previous: [N]) - Current FIXME count: [N] (previous: [N]) - Current HACK count: [N] (previous: [N]) - Trend: [Growing / Stable / Shrinking] - [Note any areas of concern] ### Previous Action Items Follow-Up | Action Item (from Sprint N-1) | Status | Notes | |-------------------------------|--------|-------| | [Previous action] | [Done / In Progress / Not Started] | [Context] | ### Action Items for Next Iteration | # | Action | Owner | Priority | Deadline | |---|--------|-------|----------|----------| | 1 | [Specific, measurable action] | [Who] | [High/Med/Low] | [When] | | 2 | [Another action] | [Who] | [Priority] | [When] | ### Process Improvements - [Specific change to how we work, with expected benefit] - [Another improvement -- keep it to 2-3 actionable items, not a wish list] ### Summary [2-3 sentence overall assessment: Was this a good sprint/milestone? What is the single most important thing to change going forward?] Phase 5: Save Retrospective Present the retrospective and top findings to the user (completion rate, velocity trend, top blocker, most important action item). Ask: "May I write this to production/retrospectives/retro-sprint-[N]-[date].md ?" (or production/retrospectives/retro-[milestone-name]-[date].md for milestone retrospectives) If yes, write the file, creating the production/retrospectives/ directory if needed. Verdict: COMPLETE — retrospective saved. If no, stop here. Verdict: BLOCKED — user declined write. Phase 6: Next Steps Use AskUserQuestion : Prompt: "Retrospective complete. The action items and velocity data are ready. Would you like to start sprint planning now with this data pre-loaded?" Options: [A] Yes — open sprint planning with retro action items and velocity delta pre-populated [B] No — I'll reference the retrospective file manually when I'm ready If the user selects [A]: Proceed to invoke /sprint-plan new , passing the retrospective file path and a summary of the action items and velocity change so the sprint planner can reference them. If this was a milestone retrospective, run /gate-check to formally assess readiness for the next phase. Guidelines Be honest and specific. Vague retrospectives ("communication could be better") produce vague improvements. Use data and examples. Focus on systemic issues, not individual blame. Limit action items to 3-5. More than that dilutes focus. Every action item must have an owner and a deadline. Check whether previous action items were completed. Recurring unaddressed items are a process smell. If this is a milestone retrospective, also evaluate whether the milestone goals were achieved and what that means for the overall project timeline.
Keywords that activate this skill. Click one to copy it.

This skill does not provide trigger words.

The downloaded .skill package contains the following fields.
Field Description
formatFormat tag (skill/v1)
skill_idUnique skill ID
nameSkill name
versionVersion
descriptionDescription
categoryCategories (array)
trigger_wordsTrigger words
tagsTags
sourceSource
source_urlSource URL (this page)
exported_atExported at (set per download)
system_promptSystem prompt body
model_configModel config: provider / model / temperature / max_tokens / top_p
examplesExamples
install_guideImport guide for Coze / Dify / Claude / custom frameworks
The same skill can be exported in different platform formats.
.skill Standard format with system_prompt and model_config, ready for any agent framework Download
.skillpro Enhanced format with scripts, tools, dependencies and hooks Download
.json Plain JSON export with system_prompt and model parameters only Download
Coze Markdown with frontmatter, for Coze platform import Download
Dify Dify DSL, import directly after creating an app Download

每日精选 Skill 推荐,免费送到你邮箱

输入邮箱,每天接收一个精选 AI Agent 技能推荐。完全免费,持续更新。

提交后我们会发送一封确认邮件,点击邮件里的链接才会开始收信。

完全免费,取消任意时间。我们不会发送垃圾邮件。