Skills Plugins MCP Prompt Model 博客 我的中心

mfg-oee-analysis

Calculate and diagnose Overall Equipment Effectiveness (OEE) by decomposing into Availability, Performance, and Quality rates. Use this skill when the user needs to measure production line efficiency, identify equipment losses, benchmark manufacturing performance, or justify capital investment — even if they say 'why is our output low', 'machine utilization report', 'production efficiency', or 'how much capacity are we losing'.

DeepseekModel キュレーション済みスキル 品質 優秀 · 78 v1.0.0

取得

https://deepseekmodel.com/api/download.php?id=asgard-ai-platform-skills-mfg-oee-analysis-skill-md&format=skill
ダウンロード .skill 標準形式。system_prompt と model_config を収録し、任意の Agent で利用可能
.skill ファイルの system_prompt フィールドの実際の内容。
name mfg-oee-analysis description Calculate and diagnose Overall Equipment Effectiveness (OEE) by decomposing into Availability, Performance, and Quality rates. Use this skill when the user needs to measure production line efficiency, identify equipment losses, benchmark manufacturing performance, or justify capital investment — even if they say 'why is our output low', 'machine utilization report', 'production efficiency', or 'how much capacity are we losing'. metadata {"category":"WP-03 製造業","tags":["manufacturing","oee","production-efficiency"]} OEE Analysis Framework IRON LAW: OEE = Availability × Performance × Quality OEE is a MULTIPLICATIVE metric. 90% × 90% × 90% = 72.9%, not 90%. Each factor compounds the loss. World-class OEE is 85%+. Most plants operate at 60-65%. Knowing the TOTAL is useless — you must decompose to find which factor is dragging performance down. The Three Factors Factor Formula Measures Loss Categories Availability Run Time / Planned Production Time Uptime vs downtime Equipment failures, changeovers, material shortages Performance (Ideal Cycle Time × Total Count) / Run Time Actual speed vs design speed Minor stops, slow running, idling Quality Good Count / Total Count Yield, first-pass quality Defects, rework, scrap, startup rejects Six Big Losses (mapped to OEE factors) Loss OEE Factor Example 1. Equipment failure Availability Machine breakdown, unplanned repair 2. Setup & changeover Availability Product changeover, die change, cleaning 3. Idling & minor stops Performance Sensor blockage, jam clearing, small adjustments 4. Reduced speed Performance Running below rated speed due to wear or material 5. Process defects Quality In-process rejects, rework 6. Startup rejects Quality Scrap during warm-up, first-article failures Calculation Example Planned Production Time: 480 min (8-hour shift) Downtime (breakdowns + changeover): 60 min Run Time: 420 min Ideal Cycle Time: 1 min/unit Total Units Produced: 380 Good Units: 360 Defective Units: 20 Availability = 420 / 480 = 87.5% Performance = (1 × 380) / 420 = 90.5% Quality = 360 / 380 = 94.7% OEE = 87.5% × 90.5% × 94.7% = 75.0% Diagnosis Steps Phase 1: Calculate OEE for each production line/machine Phase 2: Identify the weakest factor (Availability, Performance, or Quality) Phase 3: Pareto the losses within that factor (which specific loss is biggest?) Phase 4: Root cause analysis on the top loss (5 Whys, fishbone) Phase 5: Improve and remeasure Benchmarks OEE Level Rating Typical > 85% World-class Top manufacturers 60-85% Typical Room for improvement 40-60% Low Significant losses, urgent action needed < 40% Critical Equipment or process fundamentally broken Output Format # OEE Report: {Production Line} ## OEE Summary | Factor | Value | Benchmark | Status | |--------|-------|-----------|--------| | Availability | {%} | >90% | 🟢/🟡/🔴 | | Performance | {%} | >95% | 🟢/🟡/🔴 | | Quality | {%} | >99% | 🟢/🟡/🔴 | | **OEE** | **{%}** | **>85%** | 🟢/🟡/🔴 | ## Loss Breakdown | Loss | Minutes Lost | % of Total Loss | Priority | |------|-------------|----------------|---------| | {loss type} | {min} | {%} | 1/2/3 | ## Root Cause (Top Loss) {5 Whys or fishbone analysis} ## Improvement Plan | Action | Target Impact | Timeline | Owner | |--------|-------------|----------|-------| | {action} | +{X%} OEE | {weeks} | {who} | Gotchas OEE is per machine, not per plant : Plant-level OEE averages hide that one machine at 95% and another at 45% average to 70%. Analyze individually. Planned downtime is excluded : OEE measures losses against PLANNED production time. Scheduled maintenance, no-production shifts, and planned shutdowns are excluded from the denominator. 100% OEE is not the goal : It would mean zero changeovers, zero defects, running at max speed 100% of the time. Pursuing 100% can increase costs (e.g., never doing preventive maintenance). Target 85%+ for critical lines. Data collection is the real challenge : Manual OEE tracking is inaccurate. Invest in automated data collection (sensors, MES integration) for reliable measurement. References For TPM (Total Productive Maintenance) methodology, see references/tpm.md For automated OEE data collection, see references/oee-automation.md
このスキルを起動するキーワード。クリックでコピーできます。

このスキルにはトリガーワードがありません。

ダウンロードした .skill に含まれるフィールド。
フィールド 説明
formatフォーマット識別子(skill/v1)
skill_idスキル固有 ID
nameスキル名
versionバージョン
description説明
categoryカテゴリ(配列)
trigger_wordsトリガーワード
tagsタグ
sourceソース
source_urlソース URL(本ページ)
exported_atエクスポート日時(ダウンロード毎)
system_promptシステムプロンプト本文
model_configモデル設定:provider / model / temperature / max_tokens / top_p
examplesサンプル
install_guide各プラットフォームの導入説明(Coze / Dify / Claude / カスタム)
同じスキルを各プラットフォーム形式で出力できます。
.skill 標準形式。system_prompt と model_config を収録し、任意の Agent で利用可能 ダウンロード
.skillpro 拡張形式。scripts / tools / dependencies / hooks を含む ダウンロード
.json 純粋な JSON 出力。system_prompt とモデル設定のみ ダウンロード
Coze frontmatter 付き Markdown。Coze へのインポート用 ダウンロード
Dify Dify DSL。アプリ作成後にそのままインポート ダウンロード

每日精选 Skill 推荐,免费送到你邮箱

输入邮箱,每天接收一个精选 AI Agent 技能推荐。完全免费,持续更新。

提交后我们会发送一封确认邮件,点击邮件里的链接才会开始收信。

完全免费,取消任意时间。我们不会发送垃圾邮件。