shipping-and-launch
Prepares production launches. Use when preparing to deploy to production, or when asking what needs to be in place before shipping. Use when you need a pre-launch checklist, when setting up monitoring, when planning a staged rollout, or when you need a rollback strategy.
DeepseekModel
官方收录技能
质量 优秀 · 90
v1.0.0
获取
https://deepseekmodel.com/api/download.php?id=addyosmani-agent-skills-skills-shipping-and-launch-skill-md&format=skill
下载 .skill
标准格式,含 system_prompt 与 model_config,导入任意 Agent 框架即可使用
.skill 文件中 system_prompt 字段的实际内容。
name shipping-and-launch description Prepares production launches. Use when preparing to deploy to production, or when asking what needs to be in place before shipping. Use when you need a pre-launch checklist, when setting up monitoring, when planning a staged rollout, or when you need a rollback strategy. Shipping and Launch Overview Ship with confidence. The goal is not just to deploy — it's to deploy safely, with monitoring in place, a rollback plan ready, and a clear understanding of what success looks like. Every launch should be reversible, observable, and incremental. When to Use Deploying a feature to production for the first time Releasing a significant change to users Migrating data or infrastructure Opening a beta or early access program Any deployment that carries risk (all of them) The Pre-Launch Checklist Code Quality All tests pass (unit, integration, e2e) Build succeeds with no warnings Lint and type checking pass Code reviewed and approved No TODO comments that should be resolved before launch No console.log debugging statements in production code Error handling covers expected failure modes Security No secrets in code or version control The ecosystem's dependency audit ( npm audit , pip-audit , cargo audit , ...) shows no critical or high vulnerabilities Input validation on all user-facing endpoints Authentication and authorization checks in place Security headers configured (CSP, HSTS, etc.) Rate limiting on authentication endpoints CORS configured to specific origins (not wildcard) Performance Core Web Vitals within "Good" thresholds No N+1 queries in critical paths Images optimized (compression, responsive sizes, lazy loading) Bundle size within budget Database queries have appropriate indexes Caching configured for static assets and repeated queries Accessibility Keyboard navigation works for all interactive elements Screen reader can convey page content and structure Color contrast meets WCAG 2.1 AA (4.5:1 for text) Focus management correct for modals and dynamic content Error messages are descriptive and associated with form fields No accessibility warnings in axe-core or Lighthouse Infrastructure Environment variables set in production Database migrations applied (or ready to apply) DNS and SSL configured CDN configured for static assets Logging and error reporting configured Health check endpoint exists and responds Documentation README updated with any new setup requirements API documentation current ADRs written for any architectural decisions Changelog updated User-facing documentation updated (if applicable) Feature Flag Strategy Ship behind feature flags to decouple deployment from release: // Feature flag check const flags = await getFeatureFlags (userId); if (flags. taskSharing ) { // New feature: task sharing return < TaskSharingPanel task = {task} /> ; } // Default: existing behavior return null ; Feature flag lifecycle: 1. DEPLOY with flag OFF → Code is in production but inactive 2. ENABLE for team/beta → Internal testing in production environment 3. GRADUAL ROLLOUT → 5% → 25% → 50% → 100% of users 4. MONITOR at each stage → Watch error rates, performance, user feedback 5. CLEAN UP → Remove flag and dead code path after full rollout Rules: Every feature flag has an owner and an expiration date Clean up flags within 2 weeks of full rollout Don't nest feature flags (creates exponential combinations) Test both flag states (on and off) in CI Staged Rollout The Rollout Sequence 1. DEPLOY to staging └── Full test suite in staging environment └── Manual smoke test of critical flows 2. DEPLOY to production (feature flag OFF) └── Verify deployment succeeded (health check) └── Check error monitoring (no new errors) 3. ENABLE for team (flag ON for internal users) └── Team uses the feature in production └── 24-hour monitoring window 4. CANARY rollout (flag ON for 5% of users) └── Monitor error rates, latency, user behavior └── Compare metrics: canary vs. baseline └── 24-48 hour monitoring window └── Advance only if all thresholds pass (see table below) 5. GRADUAL increase (25% -> 50% -> 100%) └── Same monitoring at each step └── Ability to roll back to previous percentage at any point 6. FULL rollout (flag ON for all users) └── Monitor for 1 week └── Clean up feature flag Rollout Decision Thresholds Use these thresholds to decide whether to advance, hold, or roll back at each stage: Metric Advance (green) Hold and investigate (yellow) Roll back (red) Error rate Within 10% of baseline 10-100% above baseline >2x baseline P95 latency Within 20% of baseline 20-50% above baseline >50% above baseline Client JS errors No new error types New errors at <0.1% of sessions New errors at >0.1% of sessions Business metrics Neutral or positive Decline <5% (may be noise) Decline >5% When to Roll Back Roll back immediately if: Error rate increases by more than 2x baseline P95 latency increases by more than 50% User-reported issues spike Data integrity issues detected Security vulnerability discovered Monitoring and Observability What to Monitor Application metrics: ├── Error rate (total and by endpoint) ├── Response time (p50, p95, p99) ├── Request volume ├── Active users └── Key business metrics (conversion, engagement) Infrastructure metrics: ├── CPU and memory utilization ├── Database connection pool usage ├── Disk space ├── Network latency └── Queue depth (if applicable) Client metrics: ├── Core Web Vitals (LCP, INP, CLS) ├── JavaScript errors ├── API error rates from client perspective └── Page load time Error Reporting // Set up error boundary with reporting class ErrorBoundary extends React.Component { componentDidCatch ( error : Error , info : React . ErrorInfo ) { // Report to error tracking service reportError (error, { componentStack : info. componentStack , userId : getCurrentUser ()?. id , page : window . location . pathname , }); } render ( ) { if ( this . state . hasError ) { return < ErrorFallback onRetry = {() => this.setState({ hasError: false })} /> ; } return this . props . children ; } } // Server-side error reporting app. use ( ( err : Error , req : Request , res : Response , next : NextFunction ) => { reportError (err, { method : req. method , url : req. url , userId : req. user ?. id , }); // Don't expose internals to users res. status ( 500 ). json ({ error : { code : 'INTERNAL_ERROR' , message : 'Something went wrong' }, }); }); Post-Launch Verification In the first hour after launch: 1. Check health endpoint returns 200 2. Check error monitoring dashboard (no new error types) 3. Check latency dashboard (no regression) 4. Test the critical user flow manually 5. Verify logs are flowing and readable 6. Confirm rollback mechanism works (dry run if possible) Error Budget Release Gate Your service's error budget — the fraction of requests or time your SLO allows to fail — determines whether it's safe to ship. Use it as an objective gate — not a negotiation: Budget remaining > 20% → Ship normally; monitor closely Budget remaining 0–20% → Slow rollouts only; no high-risk changes Budget exhausted → Freeze feature work; focus entirely on reliability Budget resets → Resume normal pace; bake in the fix that recovered it A high burn rate during a canary (consuming budget faster than the baseline pace) is a hold signal in the rollout thresholds table above — treat it the same as an elevated error rate. Rollback Strategy Every deployment needs a rollback plan before it happens: ## Rollback Plan for [Feature/Release] ### Trigger Conditions - Error rate > 2x baseline - P95 latency > [X]ms - User reports of [specific issue] ### Rollback Steps 1. Disable feature flag (if applicable) OR 1. Deploy previous version: `git revert <commit> && git push` 2. Verify rollback: health check, error monitoring 3. Communicate: notify team of rollback ### Database Considerations - Migration [X] has a rollback: `npx prisma migrate rollback` - Data inserted by new feature: [preserved / cleaned up] ### Time to Rollback - Feature flag: < 1 minute - Redeploy previous version: < 5 minutes - Database rollback: < 15 minutes See Also For the project-wide Definition of Done that every change must clear before this checklist, see ../../references/definition-of-done.md For security pre-launch checks, see ../../references/security-checklist.md For performance pre-launch checklist, see ../../references/performance-checklist.md For accessibility verification before launch, see ../../references/accessibility-checklist.md For the alerting rules and SLO-tied thresholds, see observability-and-instrumentation Common Rationalizations Rationalization Reality "It works in staging, it'll work in production" Production has different data, traffic patterns, and edge cases. Monitor after deploy. "We don't need feature flags for this" Every feature benefits from a kill switch. Even "simple" changes can break things. "Monitoring is overhead" Not having monitoring means you discover problems from user complaints instead of dashboards. "We'll add monitoring later" Add it before launch. You can't debug what you can't see. "Rolling back is admitting failure" Rolling back is responsible engineering. Shipping a broken feature is the failure. "The error rate looks fine, let's keep shipping" Check the burn rate, not just the current error rate. Consuming budget faster than baseline is a hold signal even when individual thresholds are green. Red Flags Deploying without a rollback plan No monitoring or error reporting in production Big-bang releases (everything at once, no staging) Feature flags with no expiration or owner No one monitoring the deploy for the first hour Production environment configuration done by memory, not code "It's Friday afternoon, let's ship it" Error budget exhausted but feature work continues unchanged Verification Before deploying: Pre-launch checklist completed (all sections green) Feature flag configured (if applicable) Rollback plan documented Monitoring dashboards set up Team notified of deployment After deploying: Health check returns 200 Error rate is normal Latency is normal Critical user flow works Logs are flowing Rollback tested or verified ready For every shipped service: Error budget policy in place: know what action to take when budget drops below 20% and when it's exhausted
Agent 识别该技能的关键词,点击任意一个即可复制。
该技能未提供触发词。
下载的 .skill 包内含以下字段。
| 字段 | 说明 |
|---|---|
| format | 格式标识(skill/v1) |
| skill_id | 技能唯一 ID |
| name | 技能名称 |
| version | 版本号 |
| description | 技能描述 |
| category | 所属分类(数组) |
| trigger_words | 触发词列表 |
| tags | 标签列表 |
| source | 来源标识 |
| source_url | 来源链接(本页地址) |
| exported_at | 导出时间(每次下载生成) |
| system_prompt | 系统提示词正文 |
| model_config | 模型参数:provider / model / temperature / max_tokens / top_p |
| examples | 示例 |
| install_guide | 各平台导入说明(Coze / Dify / Claude / 自定义框架) |