Skills Plugins MCP Prompt Model 博客 我的中心
生活与工具 #ai #agent #mcp

electronics-sourcing

Guide for AI agents to source electronic components using parts-mcp — tool sequencing, decision patterns, and multi-step workflows

DeepseekModel 官方收录技能 质量 优秀 · 90 v1.0.0

获取

https://deepseekmodel.com/api/download.php?id=andrewyng-context-hub-content-sourceparts-skills-electronics-sourcing-skill-md&format=skill
下载 .skill 标准格式,含 system_prompt 与 model_config,导入任意 Agent 框架即可使用
.skill 文件中 system_prompt 字段的实际内容。
name electronics-sourcing description Guide for AI agents to source electronic components using parts-mcp — tool sequencing, decision patterns, and multi-step workflows metadata {"revision":1,"updated-on":"2026-03-15","source":"maintainer","tags":"electronics,sourcing,bom,components,pcb,manufacturing,workflow"} Electronics Sourcing Skill This skill teaches you how to source electronic components effectively using parts-mcp tools. It covers tool sequencing, decision patterns, and how to handle common scenarios. When to Use Which Search Tool search_parts — Use when you have a part number, description, or general keywords. This is your default starting point. "Find me a 100nF capacitor" → search_parts(query="100nF capacitor") "Look up STM32F411" → search_parts(query="STM32F411") search_by_parameters — Use when you need to match specific electrical parameters within a category. More precise than keyword search. "I need a 50V 100nF X7R 0402 cap" → search_by_parameters( parameters={"capacitance": "100nF", "voltage": "50V", "dielectric": "X7R", "package": "0402"}, category="capacitor" ) Decision rule : If the user gives you 3+ specific parameters, use search_by_parameters . For part numbers or general queries, use search_parts . The Search → Price → Availability → Alternative Pattern This is the core sourcing workflow. Follow this sequence: 1. SEARCH → Find the part 2. DETAILS → Get full specifications (if needed for validation) 3. PRICE → Compare across suppliers 4. AVAILABILITY → Check stock levels 5. ALTERNATIVE → Find replacements (only if price is too high or stock is insufficient) Do not skip steps 3 and 4. A part that exists in the database may be out of stock or prohibitively expensive. When the user asks to "source" or "find" a part, they expect pricing and availability — not just search results. Always follow through to at least step 4. BOM Processing Pattern BOM processing is asynchronous. Always follow this exact sequence: 1. upload_bom(file_path=path) → Get job_id 2. check_bom_status(job_id=job_id) → Poll until status is "complete" 3. Review matched_parts and unknown_parts 4. For unmatched: search_parts() to resolve manually 5. calculate_bom_cost() with all resolved parts Polling : Call check_bom_status and check the status field. If "in_progress" , wait and poll again. Do not assume instant completion. Handling unmatched parts : When unknown_parts is not empty, try search_parts with the value and footprint fields as the query. If still unmatched, report them to the user — do not silently skip them. Datasheet Reading Strategy Datasheets can be hundreds of pages. Always use this two-step approach: 1. list_datasheet_sections(sku="PART-NUMBER") → See the table of contents → Identify which sections contain what you need 2. read_datasheet(sku="PART-NUMBER", query="relevant keywords") → Read only matching chunks → Saves significant context window Never call read_datasheet without a query parameter unless the datasheet is short (< 20 pages). An unfiltered read of a 200-page datasheet will consume excessive context. Keyword tips : Use specific technical terms. "maximum input voltage absolute ratings" is better than "voltage". Multiple keywords narrow the results. Manufacturing Pipeline Manufacturing operations (DFM, fab quoting, assembly) are all asynchronous: submit_dfm() → check_dfm_status() # DFM analysis quote_fabrication() → check_manufacturing_status() # Fab quote quote_assembly() → polls internally # Combined fab + assembly DFM first : Always run DFM analysis before requesting a fabrication quote. DFM may reveal issues that affect manufacturability or cost. Assembly quotes combine fabrication and BOM costing in one call. Use quote_assembly when the user wants a complete per-unit cost including both PCB fabrication and component assembly. Handling Partial Failures Real-world sourcing often has partial results. Handle gracefully: Some parts not found in BOM : Report the unmatched count clearly Attempt search_parts for each unmatched part If still unmatched, list them for the user with their reference designators and values Calculate cost for matched parts, noting the incomplete total Some parts unavailable : Report which parts are out of stock Automatically call find_alternatives for each unavailable part Present alternatives with their specifications and pricing Let the user decide on substitutions Price comparison with missing suppliers : Report how many suppliers were checked Note if key suppliers (the user's preferred ones) returned no results Present available pricing data without waiting for all suppliers KiCad Project Workflow When working with KiCad projects: 1. find_kicad_projects() → Discover available projects 2. analyze_kicad_project(project_path=...) → Understand project structure 3. extract_bom_from_kicad(project_path=...) → Get component list 4. match_components_to_parts(components=...) → Match to real parts 5. Follow the BOM processing pattern above for unmatched components KiCad CLI requirement : BOM extraction may invoke kicad-cli if no existing BOM file is found in the project. Ensure KiCad 8+ is installed. Local mode only : All KiCad tools require local mode (stdio transport). They are not available in hosted/HTTP mode. Cost Optimization Tips When helping users optimize costs: Check quantity breaks : Call compare_prices with different quantities (1, 10, 100, 1000) to show price break curves Suggest alternatives : If a part is expensive, call find_alternatives and compare pricing Preferred suppliers : Use preferred_suppliers in calculate_bom_cost to bias toward the user's existing supplier relationships Consolidation : When multiple parts come from the same supplier, note the potential for consolidated shipping Response Patterns When a user asks to "source a part" : → search_parts → get_part_details → compare_prices → check_availability Present: part details, best price, stock status, and any concerns. When a user provides a BOM file : → upload_bom → poll check_bom_status → report matched/unmatched → calculate_bom_cost Present: match rate, unmatched items, total cost, per-line breakdown. When a user asks "is this in stock?" : → check_availability with quantities Present: stock levels, number of suppliers with stock, whether quantity is meetable. When a user asks about a datasheet : → list_datasheet_sections → read_datasheet with targeted query Present: the specific information requested, citing page numbers. When a user asks for a manufacturing quote : → submit_dfm (if not already done) → quote_fabrication or quote_assembly Present: DFM issues (if any), estimated cost, lead time.
Agent 识别该技能的关键词,点击任意一个即可复制。

该技能未提供触发词。

下载的 .skill 包内含以下字段。
字段 说明
format格式标识(skill/v1)
skill_id技能唯一 ID
name技能名称
version版本号
description技能描述
category所属分类(数组)
trigger_words触发词列表
tags标签列表
source来源标识
source_url来源链接(本页地址)
exported_at导出时间(每次下载生成)
system_prompt系统提示词正文
model_config模型参数:provider / model / temperature / max_tokens / top_p
examples示例
install_guide各平台导入说明(Coze / Dify / Claude / 自定义框架)
同一份技能可按不同平台格式导出。
.skill 标准格式,含 system_prompt 与 model_config,导入任意 Agent 框架即可使用 下载
.skillpro 增强格式,额外含脚本 / 工具 / 依赖 / 钩子占位 下载
.json 纯 JSON 导出,只含 system_prompt 与模型参数 下载
Coze 带 frontmatter 的 Markdown,Coze 平台导入用 下载
Dify Dify DSL,创建应用后直接导入 下载

每日精选 Skill 推荐,免费送到你邮箱

输入邮箱,每天接收一个精选 AI Agent 技能推荐。完全免费,持续更新。

提交后我们会发送一封确认邮件,点击邮件里的链接才会开始收信。

完全免费,取消任意时间。我们不会发送垃圾邮件。